NVIDIA

NVDATechnology·Market Cap: $4.6T

Total Deals

13

Total Capacity

3.4 GW

Disclosed Investment

Disclosed transactions only

Deal Period

First: Jan 2020

Latest: Apr 2026

Strategy Breakdown

Business Context

  • Hyperscalers collectively budgeted ~$600B in 2026 capex, with NVIDIA capturing the majority of AI accelerator spend as customers deploy Blackwell and upcoming Vera Rubin architectures.
  • NVIDIA Q2 FY2026 data center revenue reached $41.1B, up 56% year-over-year, driven by demand for GPU clusters supporting training and inference workloads.
  • Partnerships include 10 GW OpenAI deployment announced 2025, Europe's largest AI campus in France at 1.4 GW, and sovereign AI projects in Saudi Arabia targeting 500 MW.

Commitments

  • SBTi-validated target: 50% absolute Scope 1 and 2 reduction by FY2030 from FY2023 baseline, disclosed June 2025.
  • Achieved 100% renewable electricity for offices and data centers under operational control by end of FY2025, reducing market-based Scope 2 to zero.
  • 75% Scope 3 intensity reduction per PetaFLOP by FY2030; no absolute Scope 3 target or net-zero date announced as of March 2026.

Energy Strategy

A venture-capital approach to energy infrastructure, concentrated in 2025–2026 on equity stakes in grid-flexible AI factory developers, nuclear baseload, and battery supply-chain plays rather than traditional renewable PPAs.

  • NVentures led three equity rounds totaling ~$1.35B into Firmus Technologies (2025–2026), backing 1.6 GW of AI factories in Tasmania and mainland Australia powered by renewable grids.
  • Invested in TerraPower's $650M round (June 2025) for the Natrium SMR plant in Wyoming, marking first direct nuclear investment to secure baseload power for AI data centers.
  • Backed Commonwealth Fusion Systems' $863M round (August 2025) targeting 50–100 MW net fusion power with SPARC prototype, and Emerald AI's flexible-load software deployed at NVIDIA's 96 MW Aurora facility in Virginia.
  • Portfolio reflects a systems-level bet: securing gigawatt-scale power access and grid flexibility to unlock data center interconnection bottlenecks, not incremental renewable procurement.

Investment Timeline

Equity
Infra/Capex
JV/Partnership

Deal Breakdown

By Category

13deals
Equity
JV/Partnership
Infra/Capex

By Energy Type

Hybrid/Multiple
Storage
Nuclear
Other
Solar

Geographic Footprint

Loading map...

All Deals

DateDealCapacityValueCategory
Apr 2026

NVIDIA (NVentures) – Firmus Technologies $505M Equity Round (Round 3 / Pre-IPO)

Firmus Technologies Pty Ltd

1.6 GWEquity
Mar 2026

NVIDIA (NVentures) – Emerald AI Strategic Expansion Round

Emerald AI

Equity
Mar 2026

NVIDIA + Emerald AI – Flexible AI Factory Partnership (AES, Constellation, Invenergy, NextEra, Nscale, Vistra)

Emerald AI; AES Corporation; Constellation Energy; Invenergy; NextEra Energy; Nscale Energy & Power; Vistra

JV/Partnership
Nov 2025

NVIDIA (NVentures) – Firmus Technologies A$500M Equity Raise (Round 2)

Firmus Technologies Pty Ltd

1.6 GWEquity
Oct 2025

NVIDIA (NVentures) – Redwood Materials Series E

Redwood Materials, Inc.

Equity
Sep 2025

NVIDIA (NVentures) – Firmus Technologies A$330M Equity Placement (Round 1)

Firmus Technologies Pty Ltd

150 MWEquity
Aug 2025

NVIDIA (NVentures) – Commonwealth Fusion Systems $863M Round

Commonwealth Fusion Systems

Equity
Jun 2025

NVIDIA (NVentures) – TerraPower $650M Capital Raise

TerraPower, LLC

Equity
Apr 2025

NVIDIA – Utilidata Series C (Grid-Edge AI Platform Scale-Up)

Utilidata

Equity
Oct 2024

NVIDIA – Southern California Edison Intelligent Grid Collaboration

Southern California Edison

JV/Partnership
Feb 2022

NVIDIA – Utilidata Series B (Grid-Edge AI Platform)

Utilidata

Equity
Jan 2021

NVIDIA – Utilidata Joint Development Partnership (Karman Smart Grid AI Chip)

Utilidata

JV/Partnership
Jan 2020

NVIDIA On-Site Solar Generation (US and India Offices)

Multiple contractors

1 MWInfra/Capex